Pre-Planning Considerations
|
|
|
|
|
|
Switch Location Considerations
|
|
|
Building that has a sufficient amount of fiber
run to it. A “carrier hotel” is desirable IF access
to the MPOE is easily accessible.
Building that has adequate structural reinforcements
to withstand a moderate-intensity natural disaster
(earthquakes, etc.)
Building that has air conditioning, since telecom
equipment generates heat year round.
|
|
|
Switch Considerations
|
|
|
Switches are not easily replaced, so make sure
it has all the features you need BEFORE you buy
it.
If you own a 10,000 block (NPA-NXX) and plan on porting numbers, your switch must be LNP capable.
If you plan on ordering central office code
numbers in a mandatory pooling area (NPA-NXX-X), you must
be LNP capable and able to provide pre-recorded
messages for LRN number blocks that are not assigned.
|
|
|
NOTE: Services listed in blue are
performed by Ionary Consulting and services
listed in purple are
performed by BackUP Telecom Consulting, LLC.
Services listed in black are
not performed by either consultant.
|

Created
exclusively for BackUP Telecom Consulting
|
|
|